MMagEAMa VSC
Brand
ES Let's talk
Maintenance technician checking a gearbox on a steel rolling mill
MagEAM › Industries › Steel
Steel

Maintenance in a steel plant, from notification to closed work order.

In steelmaking, equipment works under high temperature and heavy loads, and one failure can stop the whole line. MagEAM takes each finding from the field notification to the planned, scheduled and closed work order, with an AI assistant at every stage, and works alongside the ERP the plant already has.

By area

What it looks like in each area of the plant

Examples of maintenance work in steel and how it is managed in MagEAM.

AreaTypical maintenance workHow it is managed in MagEAM
Furnaces and melt shopRefractory and high-temperature equipment inspections, failures that stop productionThe notification is created in the field by voice, image or text; a stopped piece of equipment comes in as priority P1
Continuous castingScheduled changes, rolls and cooling systemsThe work order is planned with technicians, materials, permits and support equipment, with the stock in the warehouse in view
RollingGearboxes, rolls, drives and lubricationThe AI proposes the failure catalog and the operations; the supervisor validates before it becomes a work order
Cranes and lifting equipmentPeriodic inspections and certificationsWeekly, monthly and shutdown schedule, with schedule compliance in view
The whole plantTracking maintenance performanceKPIs and budget versus actual calculated in the platform
Flow

From notification to closed work order

Five stages, with an AI assistant in each. People validate and decide. If the equipment comes from a new project, what MagORAI left ready for operation is picked up by MagEAM.

01

Work notification

The maintenance technician reports the finding in the field by voice, image or text; the AI completes the draft and the supervisor validates it.

02

Planning

The work order is built with its operations, materials, technicians and support equipment, with the stock in the warehouse in view.

03

Scheduling

Work orders go into the weekly, monthly or shutdown schedule, according to their priority.

04

Execution and close-out

The team reports what was done and the work order is closed with its history on the equipment.

05

Analysis

KPIs and budget versus actual calculated in the platform, without processing data elsewhere.

Depending on how your plant works

Three starting points

MagEAM is not chosen by company size, but by how maintenance work is managed today.

01

The plant schedules in spreadsheets

MagEAM can be its maintenance system from the start, with the work notification, the work order, planning, the weekly schedule and performance analysis.

02

The plant already runs an ERP such as SAP

MagEAM works alongside the ERP in the team's day-to-day work and does not replace it. The connection is defined in the pilot.

03

A new standard or system is coming

When a new maintenance standard arrives, a new system is being implemented or there is a major failure, a VSC team operates MagEAM alongside yours.

FAQ

Questions from steel plants

What people ask us most in steel.

Does MagEAM replace my ERP?

No. If your company already has an ERP, such as SAP, MagEAM works alongside it and does not replace it: the connection is defined in the pilot. If you do not have an ERP, MagEAM can be your maintenance system.

How does a failure that stops production come in?

As a notification for stopped equipment, with priority P1, the highest. The supervisor validates it before it becomes a work order.

Who approves the work notification?

The supervisor. The maintenance technician creates the notification, the AI proposes the failure catalog, the operations and the resources, and the supervisor validates it before it becomes a work order.

Let's talk

Is your maintenance team still scheduling in spreadsheets?

Tell us how your plant works today. We will reply with a proposal to get started.